Kessil

Vintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead Scripto

Description: Eberhard Faber H Medium Hard Mongol Long Thin Leads For Mechanical Pencils 4010. Condition is Used. Shipped with USPS Ground Advantage.

Price: 6.95 USD

Location: Fort Payne, Alabama

End Time: 2024-10-22T18:55:29.000Z

Shipping Cost: 7 USD

Product Images

Vintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead ScriptoVintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead ScriptoVintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead ScriptoVintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead ScriptoVintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead ScriptoVintage Lead Lot Of 2 Eberhard Faber H Mongol Long Thin Leads-Long Lead Scripto

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: Eberhard Faber

Lead Grade: HB

Material: Wood and Lead

Country/Region of Manufacture: United States

Handmade: No

California Prop 65 Warning: N/A

Vintage: Yes

Recommended

2 Vintage Eberhard Faber Art Gum Eraser  USA NOS
2 Vintage Eberhard Faber Art Gum Eraser USA NOS

$9.99

View Details
4 NOS Vintage Eberhard Faber Microtomic 603 3H Drafting Drawing Pencils
4 NOS Vintage Eberhard Faber Microtomic 603 3H Drafting Drawing Pencils

$31.99

View Details
Box of 6 Vintage Eberhard Faber Stenorace Typing Erasers No. 1407 New & Unused
Box of 6 Vintage Eberhard Faber Stenorace Typing Erasers No. 1407 New & Unused

$15.00

View Details
NOS Vintage Eberhard Faber EF MONGOL 482 No. 2 Writing Pencils w/Box 12
NOS Vintage Eberhard Faber EF MONGOL 482 No. 2 Writing Pencils w/Box 12

$20.00

View Details
TWO (2) Eberhard Faber Microtomic 603-5H – Vintage Woodclinched Pencils (No Box)
TWO (2) Eberhard Faber Microtomic 603-5H – Vintage Woodclinched Pencils (No Box)

$27.99

View Details
Eberhard Faber Mongol Pencils #2 XL Pencils 24 Pcs Box of 2 Philippines
Eberhard Faber Mongol Pencils #2 XL Pencils 24 Pcs Box of 2 Philippines

$25.00

View Details
Vintage Eberhard Faber NOS Wood Scoring Pencil Lot of 3 Golf Bridge USA
Vintage Eberhard Faber NOS Wood Scoring Pencil Lot of 3 Golf Bridge USA

$24.99

View Details
Eberhard Faber Microtomic 603 Hi-Density Graphite Woodclinched Pencils Vintage
Eberhard Faber Microtomic 603 Hi-Density Graphite Woodclinched Pencils Vintage

$95.00

View Details
Vintage UNUSED Eberhard Faber Blackwing 602 Woodclinched Pencil #10076
Vintage UNUSED Eberhard Faber Blackwing 602 Woodclinched Pencil #10076

$44.99

View Details
Vintage Eberhard Faber Mongol No.2 293 Fine Writing Pencils NEW NOS
Vintage Eberhard Faber Mongol No.2 293 Fine Writing Pencils NEW NOS

$6.99

View Details